High-speed railway line from Heifei to Fuzhou – Mingan section Lot 3
Client | MOR Ministry of Railway, China |
Speed | 350 km/h – ballast-less track |
Total length | 810 km |
Planning period | 2009 – 2011 |
Services | Supervision |
Completion | 2010-2014 |
The planned section runs over 12.664 km on subgrade, 30.718 km on bridges (64 bridges) and on 58.363 km in tunnels (36 tunnels). Included are two railway stations.